Dong Mai Industrial Zone
|
Major Roads |
The internal roads of the Industrial Park are designed to connect to National Road No.18 To Ha Long City: 30km, Uong Bi City: 5km, Hai Phong City: 30km To Ha Noi: 107km Internal road: main road – 43m wide, branch road – 21-27m wide |
---|---|
Railway Network |
Along Yen Vien (Ha Noi) – Pha Lai – Ha Long – Cai Lan (Quang Ninh) Railway To Uong Bi (Uong Bi City, Quang Ninh Province) Railway Station: 3km |
Nearest Airports |
To Noi Bai Airport (Ha Noi): 130km To Cat Bi Airport (Hai Phong): 50km To Van Dong Airport (Quang Ninh): 75km |
Any Other Transportation |
To Cai Lan Sea Port (Ha Long, Quang Ninh): 26km To Hai Phong (Hai Phong City) Port: 37km Office station inside the zone |
Warehouses |
Warehouse inside the zone with area: Minimum land plot: 10,000m2 - Factory: Built up area: 1,000m2 |
Power Station Capacity |
Power is supplied from the national grid through 110/22KV transformer station with capacity of 2x25MVA |
Electrical Price per Unit |
0.05 USD/kWh |
Portable Water |
Water supply station with the capacity of 6,500m3/day |
Water Price per Unit |
0.4 USD/m3 |
Waste Water Treatment Location |
Industrial zone centralized wastewater treatment station |
Waste Water Treatment Capacity |
4,800 m3/day |
Internet Facility |
Internet supplied by VNPT, EVN, Viettel |
Dormitory for Staff / Workers |
Urban area with total area of 9.1 ha is adjacent to the zone |
School/College/Technical Institutes |
Nearby the high-quality education system of the northern Vietnam |
Hospital |
Nearby health clinics, domestic and international hospital (Quang Ninh General Hospital, Vinmec International Airport) |
Bank |
Nearby branches of Vietnamese banks |
Post Office |
Nearby post office |
Website | http://qeza.gov.vn |
---|---|
Contact Details |
Quang Ninh Economic Zone Authority – Address: Provincial Administrative Building No.2, Nguyen Van Cu Street, Hong Ha Ward - Ha Long City, Quang Ninh Province, Vietnam – Email: banktnd_qn@hn.vnn.vn |